OurĀ  Projects

Success Stories

Here are some of our success stories with some of the most reputed clients in India.

SIDBI

City:

Mumbai

Duration:

1 Month

Completed:

December 2023

Project Details:

Compact roof rig for spiderman facade access and cleaning.

Easily Portable and compact roof rig for spiderman to clean the glass facade in every corners.

My Home Builder

City:

Hyderabad

Duration:

2 Months

Completed:

January 2021

Project Details:

Alluminium alloy davits for facade access and cleaning

Easily Portable Aluminum Alloy Davits are light in weight but strong in capacity. Davits can be mounted on the Parapet brackets with locking shaft at various points and levels around perimeter of the building. Easily transferred from one location to another by two window cleaners & they can be re-erected in matter of seconds. Pair of Davits are capable of carrying weight of Cradle plus 180 kg, which is two persons weighing 80 kg each plus 20 kg additional load

Manba Finance

City:

Thane

Duration:

1 Month

Completed:

June 2017

Project details:

Compact Portable roof rig for spiderman cleaning

Easily Portable and Dismantlable Roof Rig Equipment is used for spider man cleaning by travelling it to any flat corner space of the terrace. Full frame of the Rigs are Fabricated with Mild steel and Galvanised for environmental rust protection. Bottom frame is fabricated and attached to Nylon wheel and counterweight for better stability. Front Beam is provided with Spider man Rope Anchoring Point. Standard height is 1500 mm. But can be suited as per Terrace Parapet height

Time Square

City:

Mumbai

Duration:

2 Months

Completed:

November 2017

Project Details:

Aluminium alloy track layout and Bracket design

Aluminium alloy track layout design and bracket design for the estimated 2 man cradle of 1 tonne with 500 kg on single wire rope suspended on the track. This project was done for Times Square for its external facade access and cleaning.

Sun Pharma

City:

Mumbai

Duration:

1 Month

Completed:

May 2016

Project Details:

Scaffolding design and installation

25 meter Scaffolding work design and installation

Indian Oil – CKCEC

City:

Paradip, Odisha

Duration:

2 Months

Completed:

March 2018

Project Details:

Moving platform design.

Moving platform design and fabrication done. The height of the platform is 2metre to 4meters.